Vizsla Copper Drills 297.8 m of 0.49% CuEq as Thira Discovery Extends to 670 m Depth

Vizsla Copper Corp. (TSXV: VCU) has released the first results from its Phase 2 summer drill program at the Thira copper-molybdenum discovery on its Poplar Project in central British Columbia.

Hole TH26-170, drilled to test the depth of mineralization on the north side of Thira, returned 297.8 metres of 0.49% copper equivalent (0.29% copper, 0.027% molybdenum, 0.03 g/t gold and 1.6 g/t silver) from 386.0 metres, including 52.2 metres of 0.64% CuEq (0.43% Cu) from 563.8 metres. Hole TH26-169, a 200-metre step-out to the east, returned 243.5 metres of 0.22% CuEq above a lower 0.1% copper cut-off. The company says true thickness is unknown.

Vizsla says drilling now defines a mineralized footprint of about 800 by 900 metres, from bedrock to about 670 metres below surface, where it remains open at depth. Phase 2 totalled more than 8,800 metres in 17 holes, bringing 2026 drilling at Poplar to about 20,000 metres. Results are still pending for seven more Thira holes, six at Camp Lake and two at Copper Pond.

Separately, two rigs are drilling a program of more than 2,000 metres at the company's Copperview project near Merritt, testing the undrilled M5 geophysical target.

Source: Vizsla Copper Corp. news release, November 12, 2026 (Canada Newswire). Read the full release.

Share this on: