Snowline Hits 1.03 g/t Gold Over 65.8 m at Duke Target, 1.47 g/t Over 450.2 m From Surface at Valley

Snowline Gold Corp. (TSX: SGD) has reported more results from its 2026 program on the 100%-owned Rogue Project in eastern Yukon, including new drilling at the Duke target, about 12 km southeast of its Valley gold deposit.

At Duke, hole DUK-26-004 returned 65.8 m of 1.03 g/t gold from 230.0 m downhole, including 1.0 m of 32.20 g/t. Hole DUK-26-005, collared about 675 m to the northeast, cut 54.5 m of 0.41 g/t gold from 121.0 m, including 9.0 m of 1.12 g/t. Snowline drilled five holes for roughly 1,600 m at Duke this year; assays for one hole are still to come. The company says the mineralization in DUK-26-004 is more extensive than what shows at surface and may be open at depth.

At Valley, infill hole V-26-165 returned 450.2 m of 1.47 g/t gold from surface, including 210.5 m of 2.07 g/t, which the company says outperformed its resource block model at that location. The hole finished in a separate interval of 44.3 m of 0.72 g/t gold, ending at 558.3 m in an area not yet thoroughly explored.

Results elsewhere were mixed. Drilling at the Gracie target did not find the intrusion believed to be driving the system there, and the first hole at Crossroad, on the Cynthia Project, returned 1 m of 1.24 g/t gold and several low-grade intervals.

The 2026 results will not feed into the Valley pre-feasibility study, which Snowline says remains on track for Q1 2027 alongside a project description to begin permitting review.

Source: Snowline Gold Corp. news release, November 18, 2026 (GlobeNewswire). Read the full release.

Share this on: