Skeena Intersects 36.75 g/t AuEq over 18.32 metres in 21A Zone Infill Drilling at Eskay Creek

Vancouver, BC (November 24, 2020) Skeena Resources Limited (TSX: SKE, OTCQX: SKREF) (“Skeena” or the “Company”) is pleased to report additional diamond drill core results from the Phase 1 combined campaign of definition and exploration drilling at the Eskay Creek Project (“Eskay Creek” or the “Project”) located in the Golden Triangle of British Columbia. The Phase 2 infill program, focused upon resource category conversions for the Pre-Feasibility Study (“PFS”) on open-pit constrained resources, is on-going with eleven drill rigs currently active. Reference images are presented at the end of this release as well as on the Company’s website.
 
Eskay Creek Phase 1 Infill Drilling
21A Zone Highlights:

  • 5.15 g/t Au, 21 g/t Ag (5.44 g/t AuEq) over 31.12 m (SK-20-420)
  • 36.66 g/t Au, 7 g/t Ag (36.75 g/t AuEq) over 18.32 m (SK-20-421)

 22 Zone Highlights to Date:

  • 6.89 g/t Au, 122 g/t Ag (8.52 g/t AuEq) over 48.74 metres (SK-20-389)
  • 3.11 g/t Au, 106 g/t Ag (4.52 g/t AuEq) over 29.60 m (SK-20-384)
  • 1.39 g/t Au, 195 g/t Ag (3.99 g/t AuEq) over 86.57 m (SK-20-406)
  • 1.99 g/t Au, 127 g/t Ag (3.68 g/t AuEq) over 80.69 m (SK-20-415)
  • 2.97 g/t Au, 57 g/t Ag (3.73 g/t AuEq) over 39.80 m (SK-20-416)
  • 2.51 g/t Au, 62 g/t Ag (3.33 g/t AuEq) over 59.50 m (SK-20-423)

Gold Equivalent (AuEq) calculated via the formula: Au (g/t) + [Ag (g/t) / 75]. True widths range from 70-100% of reported core lengths for the 21A and 21C Zones Apparent widths are reported for the 22 Zone due to the geometry of the mineralization and the orientation of the drill holes. Length weighted AuEq composites are constrained by geological considerations. Grade-capping of individual assays has not been applied to the Au and Ag assays informing the length-weighted AuEq composites. Metallurgical processing recoveries have not been applied to the AuEq calculation and are taken at 100%. Samples below detection limit were nulled to a value of zero.

21A Zone Phase 1 Infill Intersects High Tenor Gold Mineralization
Phase 1 drilling within the 21A Zone continues to yield exceptional grades highlighted by recent intersections of 5.15 g/t Au, 21 g/t Ag (5.44 g/t AuEq) over 31.12 m, and 36.66 g/t Au, 7 g/t Ag (36.75 g/t AuEq) over 18.32 m (SK-20-420 and SK-20-421, respectively). The high-grade intersection in SK-20-421 includes a sub-interval with an extremely high gold grade of 147.50 g/t Au, <5 g/t Ag (147.50 g/t AuEq) over 3.00 m hosted within brecciated rhyolites, footwall to the Contact Mudstone. These new intercepts enhance the expected grades and widths of the 21A Zone when compared to historical intercepts of 2.34 g/t AuEq over 12.78 m and 1.62 g/t AuEq over 7.00 m (SK-19-165B and CAN89-088, respectively) in the vicinity (see section 10090N below).

Robust Grades and Widths Confirmed in 22 Zone Infill Drilling
The recently completed drilling in the 22 Zone continues to demonstrate the precious metal enrichment associated with an interpreted syn-volcanic feeder zone crosscutting the footwall rhyolite. The high-grade silver mineralization within this area is quite impressive as illustrated by intercepts of 1.39 g/t Au, 195 g/t Ag (3.99 g/t AuEq) over 86.57 m, which includes sub-intervals grading 1.84 g/t Au, 2,400 g/t Ag (33.84 g/t AuEq) over 1.10 m, and 2.77 g/t Au, 1,840 g/t Ag (27.30 g/t AuEq) over 1.24 m (SK-20-406). Zonation of Au-Ag ratios is evident throughout the 22 Zone when compared to 2020 Phase 1 drill hole SK-20-389 (released November 19, 2020) which intersected above average gold grades of 6.89 g/t Au, 122 g/t Ag (8.52 g/t AuEq) over 48.74 m (refer to Table 1 below).

Table 1: 2020 Phase 1 Drill Hole SK-20-389 – 22 Zone Detailed Au-Ag Results


About Skeena
Skeena Resources Limited is a junior mining company focused on developing the past-producing Eskay Creek gold-silver mine located in Tahltan Territory in the Golden Triangle of northwest British Columbia, Canada. The Company released a robust Preliminary Economic Assessment in late 2019 and is currently focused on infill and exploration drilling at Eskay Creek to advance the project to Prefeasibility. Skeena is also exploring the past-producing Snip gold mine.

On behalf of the Board of Directors of Skeena Resources Limited,

Walter Coles Jr.
President & CEO

Contact Information

Investor Inquiries: info@skeenaresources.com
Office Phone: +1 604 684 8725
Company Website: www.skeenaresources.com

Share this on: