Silver Pony Resources has completed its inaugural drill program at the Silver Pony Project in southeastern BC, drilling 10 holes for 2,280.17 metres across two target areas.
The company reports that hole SP-26-009 on the Revelstoke Trend intersected 7.5 metres of galena-pyrite mineralization in veined and locally brecciated marble, from 156.5 to 164.0 metres down the hole. All six holes drilled on the Revelstoke Trend intersected mineralized intervals within the same marble and schist package. These are visual observations; assay results are still pending from the laboratory.
VP of Exploration Chris Furey said the team went from surface showings to a completed first drill program in its first season. The company is now working on a three-dimensional structural interpretation of the drilling and plans to evaluate the Ophir Lade vein system for possible drilling once its geometry is better understood.
Source: Silver Pony Resources Corp. news release, October 1, 2026, via Newsfile. Read the full release.









