Brixton Metals has reported the last of its 2026 results from the Camp Creek high-sulphidation target at its Thorn project in northwestern BC. Hole THN26-371 returned 58 metres of 0.40 g/t gold and 6.40 g/t silver (0.50 g/t gold equivalent), and hole THN26-385 returned 17.58 metres of 1.47 g/t gold equivalent, including 1.18 metres of 5.78 g/t gold, 405 g/t silver and 1.97% copper.
The company now interprets the Glenfiddich Zone as a series of stacked veins rather than a single structure, extended to 580 metres along strike and 350 metres down-dip, and still open. Drilling at Thorn is finished for the season, at 6,592 metres in 25 holes, and a Mineral Resource Estimate with APEX Geoscience is expected in the first quarter of 2027. Reported intervals are core lengths; true widths have not yet been determined.
Source: Brixton Metals Corporation news release, September 29, 2026, via GlobeNewswire. Read the full release.









