Imperial Metals Reports Third Quarter Copper and Gold Production at Mount Polley Mine

VANCOUVER, British Columbia — October 20, 2025 — Leads & Copy — Imperial Metals Corporation (TSX:III) reported its third quarter copper and gold production from the Mount Polley mine, which is 100% owned. Production reached 7.655 million pounds of copper and 9,285 ounces of gold.

Mount Polley’s metal production for Q3 2025 saw 7.655 million pounds of copper and 9,285 ounces of gold, a slight decrease compared to the 9.822 million pounds of copper and 9,527 ounces of gold from Q3 2024. Mill throughput increased by 5% to 1.780 million tonnes, up from 1.694 million tonnes in the same quarter last year. The dip in metal production reflects lower grades and copper recovery, offset partially by the increased throughput.

Over the first nine months of 2025, increased throughput alongside consistent copper and gold grades and recoveries resulted in marginally lower copper production but a 4.8% increase in gold production compared to last year.

Phase 4 pushback from the Springer pit accounted for 41% of the ore in Q3, while stripping of Phase 5 pushback made up 51%. Approximately 1.0 million tonnes of Non-Acid Generating “NAG” waste was moved to the Tailings Storage Facility.

The company anticipates copper production for the year to be around 30 million pounds, surpassing the initial target. Gold production is projected to reach 40,000 ounces for 2025, aligning with the high end of the target.

Brian Kynoch, P.Eng., President of Imperial, has reviewed and approved the content in this release as the designated Qualified Person according to National Instrument 43-101.

Contact:
Brian Kynoch | President | 604.669.8959
Darb S. Dhillon | Chief Financial Officer | 604.669.8959

Source: Imperial Metals Corporation

Share this on: