Golden Dawn Mobilizing Diamond Drill to Lexington Property

, , , , ,
VANCOUVER, Canada, September 22, 2021, Golden Dawn Minerals Inc., (TSX-V: GOM | FRANKFURT: 3G8C | OTC Pink: GDMRD), (“Golden Dawn” or the “Company”), announces that it is starting to mobilize crews and equipment for drilling the Lexington Property at the Greenwood Precious Metals project in southeastern BC. 
Photo of drilling equipment being mobilized.
Golden Dawn is mobilizing crews and equipment to initiate diamond drilling at the Lexington property.  Drilling is expected to commence within a few days.  The first holes will be located close to the Lexington Mine permit area where there is potential to extend the mineralized zones northwest of the mine. Later drilling will be located southeast of the mine where historic drill intercepts indicate significant copper-gold mineralization along the No. 7 fault zone within which the Lexington deposit occurs.
Map of the Greenwood Precious Metal Project showing the Lexington property (bottom center).
Map showing the No. 7 fault trend of mines and historic intercepts around the Lexington mine.
Readers are cautioned that historical records referred to in this News Release have been examined but not verified by a Qualified Person. Further work is required to verify that historical records referred to in this News Release are accurate.
 
Technical disclosure in this news release has been approved by Dr. Mathew Ball, P.Geo., President of the Company and a Qualified Person as defined by National Instrument 43-101,
 
For more details, please see the most recent National Instrument 43-101 Technical Report on the Company’s website at www.goldendawnminerals.com.
 
On behalf of the Board of Directors:
GOLDEN DAWN MINERALS INC.
Per: “Christopher R. Anderson”
 
Christopher R. Anderson   CEO
 
For further information, please contact:
Golden Dawn Minerals Inc. — Corporate Communications
Tel: 604-221-8936
Email: Office@goldendawnminerals.com

Share this on: